Long leads Hampton against Boston College after 21-point game

Carbonatix Pre-Player Loader

Audio By Carbonatix

Hampton Pirates (2-3) at Boston College Eagles (2-2)

Boston; Tuesday, 7 p.m. EST

BETMGM SPORTSBOOK LINE: Eagles -12.5; over/under is 138.5

BOTTOM LINE: Hampton faces Boston College after Xzavier Long scored 21 points in Hampton's 67-61 loss to the Holy Cross Crusaders.

Boston College went 12-19 overall with a 9-8 record at home during the 2024-25 season. The Eagles averaged 70.4 points per game while shooting 43.2% from the field and 34.4% from behind the arc last season.

The Pirates are 1-2 on the road. Hampton ranks sixth in the CAA shooting 31.9% from 3-point range.

___

The Associated Press created this story using technology provided by Data Skrive and data from Sportradar.

 

Salem News Channel Today

Sponsored Links

On Air & Up Next

  • The Mike Gallagher Show
    8:00PM - 11:00PM
     
    Mike Gallagher is one of the most listened-to radio talk show hosts in America.   >>
     
  • That Kevin Show
    11:00PM - 1:00AM
     
    Broadcast from the heart of Times Square, Kevin McCullough takes America’s   >>
     
  • The Larry Elder Show
    1:00AM - 3:00AM
    The Larry Elder Show
    (888) 971-7243
     
    Larry Elder personifies the phrase “We’ve Got a Country to Save” The “Sage from   >>
     
  • Firing Line Radio Show
    3:00AM - 4:00AM
     
    Rick Travis will cover the world of firearms each week in an entertaining and   >>
     
  • The Gold Show with Alan Johnson
    4:00AM - 5:00AM
     
    Listen to The Gold Show with Alan Johnson right here on AM590 The Answer -   >>
     

See the Full Program Guide